From there it comes down to three things: what each budget leaves out, what moving the sink or stove adds behind the wall, and the ten lines a quote needs before you can hold it up against another.
On this page
What a kitchen renovation costs in Canada
These are five different jobs, not five price tiers of the same job. Our kitchen page starts where you should: "Choose the level of change first." A refresh puts new surfaces on the boxes you have. A replacement brings in new boxes on the same footprint. A layout change moves the plumbing, gas or wiring as well, and that's where the big jump lives. We also price refacing and a quartz top on their own. The figures come from our kitchen renovation page, where you can also find renovators by city.
Five kitchen jobs and what we budget for each
| Job | Planning budget | What's included | Budget separately |
|---|---|---|---|
| Refresh, keeping the cabinet boxes | $10,000 to $35,000 per defined kitchen | The sound cabinet boxes and fixture locations stay. Selected fronts, counters, backsplash, finishes and hardware are updated. | New cabinet boxes, appliances and moving any services |
| New cabinets and surfaces, same layout | $20,000 to $45,000 per kitchen | New stock or semi-custom cabinets, counters, backsplash and lighting, with the footprint and rough-in positions kept | Appliances, structural changes, and moving plumbing or gas |
| Renovation with layout changes | $45,000 to $85,000 per assessed project | A mid-range complete kitchen with new cabinets and surfaces, plus relocated fixtures or an island, with no major structural opening | Appliances, load-bearing wall work and hidden defects nobody has found yet |
| Cabinet refacing | $4,500 to $15,000 per defined kitchen cabinet package | New doors, drawer fronts and matching exposed surfaces, installed on sound existing boxes | New boxes or layout changes, a new countertop, and hardware upgrades not listed |
| Quartz countertop replacement | $70 to $180 per installed sq ft | Quartz supply, fabrication, a basic edge and installation | Cutouts, removing the old top, cabinet reinforcement and plumbing reconnection |
Planning budgets from our kitchen renovation category, in Canadian dollars. They draw on published Canadian provider prices and cost guides, so they aren't a national average or a quote from any company we list. Tax treatment varies, so confirm tax and the final total on the written quote.
Appliances turn up on the budget-separately list of every whole-kitchen job. The range, the fridge and the dishwasher are their own shopping trip, whatever level of change you pick. If the kitchen is one room of a bigger job, our whole-house renovation guide prices the whole house per square foot.
Cabinets first, then the counters
"Most kitchen jobs are decided by the layout and the cabinets," our kitchen page says, and it sets out the ladder like this. "A refresh keeps the cabinet boxes. Refacing changes the fronts and exposed surfaces. A replacement kitchen includes new boxes." Refacing only works on sound boxes, keeps your layout and leaves the countertop as a separate job.
Going custom is a budget of its own. Our page for custom cabinet makers puts a standard custom kitchen at $25,000 to $45,000 for the cabinetry alone. Its best quote question is worth stealing: "Does the cabinet schedule specify every box, drawer, exposed panel, finish and hardware item?"
Cabinets should be "ordered with a confirmed delivery" before demolition day, and "Counters can't be templated until the boxes are in and level." So the counter is the last big number to firm up.
Our own two pages disagree on quartz, and we'd rather show you both. Our kitchen page budgets $70 to $180 per installed square foot, with cutouts and plumbing extra. Our page for countertop and tile installers says $60 to $130, with one sink cutout included. Either way, measure the countertop surface, not the kitchen floor. "The slab you tag is the one the shop cuts," so ask for a drawing that shows where the seams and the sink cutout land "before anyone starts a saw."
Here's a cheap trick: stone on the island and a cheaper surface on the perimeter. And since forced-air heat "pulls moisture out of wood all winter," a shop that builds for our climate leaves solid panels room to shrink.
All of that assumes the plumbing stays where it is.
What changes once the sink or stove moves
This is the biggest step in our kitchen renovation cost figures. New cabinets and surfaces in the same layout run $20,000 to $45,000. Move the services and the budget becomes $45,000 to $85,000, roughly double at both ends. An island counts too, since our layout-change row covers "relocated fixtures or an island."
Our page names the cause in its list of what changes the price: "Keeping or relocating plumbing, wiring, ventilation and walls." Each of those means its own trade, often a licence, and sometimes a permit. Appliances and load-bearing wall work sit outside even the bigger budget, and so do hidden defects nobody has found yet.
That's why our page says to "Price the proposed service relocations explicitly." Ask every bidder for two prices: the kitchen in the layout you have, and the kitchen you've been sketching on napkins. Size still counts, though. "A larger retained-layout kitchen can cost more than a smaller one with a minor relocation."
Here's what a move can add behind the drywall.

Who's allowed to move the pipes, gas and wiring
Our kitchen page sums it up: "The trades behind the walls are licensed, and the rules change at the provincial border." Ontario spells its rules out clearly, so start there.
Toronto's building permit list says you need a permit to "Install or modify heating and or plumbing systems" and for "adding or removing walls." You don't need one for "Installation of cabinetry and millwork" or for "Repairing and replacing plumbing fixtures." So new cabinets with the sink in its old spot need no building permit in Toronto. Moving the sink means modifying the plumbing, which does need one. Toronto calls its list "not exhaustive," and other cities keep their own. Ask before demolition, not after.
The Electrical Safety Authority is blunt about wiring: "only Licensed Electrical Contractors (with some exemptions, such as HVAC installers) are legally authorized to do electrical work in your home." A general contractor can't do it without that licence. You may wire your own home yourself, but you still file the notifications with ESA.
Gas is narrower still. The Technical Standards and Safety Authority says "Registered Fuels Contractors are the only businesses that are legally authorized to do fuels related work in Ontario," and its registry lets you check a company. So the gas side of a moved range, hookup included, goes to a registered contractor. Outside Ontario, our furnace guide covers who may do gas work in other provinces. Plumbing has its own certificates as well, and our plumber guide shows which provinces license plumbers and how to check one.
Quebec works differently. Anyone paid in money or in kind to do construction work for someone else needs a licence from the Régie du bâtiment du Québec. Its own consumer page names a kitchen renovation as a job for a licensed contractor. The RBQ also tells contractors to print their licence number "on your estimates, bids, contracts, account statements and invoices," written as "RBQ licence: XXXX-XXXX-XX." That's 10 digits. Members of the master electricians' and master pipe mechanics' corporations (CMEQ and CMMTQ) may show those corporations' logos instead. Look the number up in the RBQ's licence holders' repertory before you sign.
We're not your city's building department. On permits, its answer is the one that counts.
What a Canadian winter asks of your range hood
Start with the cap, which our kitchen page covers in one line: "A range hood ducted outside needs a cap with a damper that shuts tight, or you'll feel the draft all winter."
The same page adds: "A tight modern house may also need make-up air for a strong hood." A hood pushes air out, and the same amount has to get back in somewhere. In a tight house it has few gaps to come through, so the house goes negative and the hood can fall short of its rating.
The bigger worry is safety. Where a furnace or water heater vents into a chimney, a strong kitchen fan can pull that appliance's exhaust back into the house. The Building Officials' Association of BC lists what follows: backdrafting of combustion appliances, and carbon monoxide getting in.
Ontario's building code is specific here. Since January 1, 2025, it has followed the 2020 National Building Code on this point. In a home with a fuel-burning furnace, boiler or water heater that isn't direct-vent or mechanically vented, exhaust fans beyond the main ventilation fan need outdoor make-up air. A fan has to bring in at least as much air as the hood pulls out, and switch on whenever the hood does. A depressurization test can clear a house if it shows the appliances stay within the test standard's limits. Your own check is simpler. If the furnace or water heater vents into a chimney rather than out through the wall, raise make-up air before you pick the hood.
You'll see 400 CFM quoted on American sites as the point where a hood needs make-up air. That's an American trigger. Ontario's make-up air rule ignores the hood's size. It turns on how your furnace and water heater vent.
So the quote should say where the duct goes and answer the make-up air question in writing.
How to get kitchen quotes you can actually compare
Our kitchen page says to "Compare kitchens with the same layout, cabinet specification and appliance allowance." The way to get there is to "Send every bidder the same cabinet schedule, countertop measurements and appliance list." Then hold every quote against one list, because small allowances make a quote look cheap on paper.
Before you sign, each kitchen quote should name:
- A cabinet schedule listing every box, door, drawer, panel, finish and hardware item, and what the boxes are made of.
- The countertop material, its square footage, the edge and every cutout.
- Your appliance list, and who supplies, delivers and connects each one.
- A price for the layout you have and a separate price for each move.
- Every allowance, with its dollar amount and what happens when your pick costs more.
- Who applies for each permit, and who pays for it.
- The licensed trades doing the plumbing, gas and wiring, plus the contractor's RBQ licence number in Quebec.
- A range hood ducted outdoors with a damper cap, and a written yes or no on make-up air.
- How problems found behind the walls get priced and approved before that work starts.
- The tax, and the final total.
The deposit and the payment schedule belong in writing too, and our lien guide covers how much to hold back from each payment.
The label to ask for on the cabinet boxes
"Ask what the boxes are made of," our cabinet makers page says. Since January 7, 2023, federal rules have capped formaldehyde emissions from hardwood plywood, particleboard and MDF sold in Canada, including panels built into cabinets.
The Formaldehyde Emissions from Composite Wood Products Regulations also call for a label on finished goods made from those panels. It names the maker, importer or seller, gives the month and year of manufacture, and carries a TSCA Title VI or CANFER compliance statement. The label is a stamp, tag or sticker on the product, its bundle or its packaging. Ask to see it before the boxes go in and the packaging goes out.
A seller that bought labelled stock may sell it without the label, as long as it keeps a copy and shares the details on request. So "Can you show me the label or its details?" is a fair question. Put it to the supplier or cabinet shop, since someone who only installs isn't the seller under the rules. An optional "NAF" (no added formaldehyde) or "ULEF" (ultra-low-emitting formaldehyde) mark goes further than the minimum.
Frequently asked questions
Is $30,000 enough for a kitchen renovation?
Often, if the layout stays where it is. Our planning budget for new cabinets and surfaces in the same layout is $20,000 to $45,000, and a refresh that keeps the cabinet boxes runs $10,000 to $35,000. Once the sink, the stove or an island moves, our budget starts at $45,000. Appliances aren't in any of those numbers, so set money aside for them.
Do you need a permit to renovate a kitchen?
It depends on what changes. Toronto doesn't require a building permit to install cabinets or to replace plumbing fixtures, but it does to install or modify plumbing or heating, or to add or remove walls. Other cities keep their own lists, so ask yours before demolition. In Ontario, wiring you hire out has to go to a licensed electrical contractor.
Is it cheaper to reface kitchen cabinets or replace them?
Refacing is cheaper, as long as the boxes are sound. Our planning budget for refacing is $4,500 to $15,000, for new doors, drawer fronts and matching exposed surfaces on the boxes you have. New custom cabinetry alone runs $25,000 to $45,000 on our cabinet makers page. Refacing keeps the layout as it is, and a new countertop is extra either way.
How much do quartz countertops cost installed?
Our two pages that price quartz don't quite agree. Our kitchen renovation page puts a quartz top at $70 to $180 per installed square foot, with cutouts and plumbing priced separately. Our tile and stone page says $60 to $130, with one sink cutout included. Measure the countertop surface, not the kitchen floor, and ask how cutouts, edges and removal are priced.
Do kitchen cabinets have formaldehyde in them?
They can. Federal rules cap formaldehyde emissions from particleboard, MDF and hardwood plywood, including panels built into cabinets. Since January 7, 2023, finished goods made from those panels need a label naming the maker, importer or seller, the month and year made, and TSCA Title VI or CANFER compliance. Ask your supplier for it before the boxes go in.
Does a new range hood need make-up air?
Sometimes. If your furnace or water heater vents into a chimney, a strong hood can pull its exhaust back into the house. In homes like that, Ontario's building code since 2025 requires extra exhaust fans, range hoods included, to come with a make-up air fan that runs whenever they do, following the 2020 National Building Code. A depressurization test can clear a house. Ask before you buy the hood, not after it's on the wall.
Once three kitchen quotes answer the same ten lines, compare them, and if you need another, start with the kitchen renovators near you.
